(Item A-12) Delta Sierra Middle School Paving Replacement Project 8150-5830-7 Deductive Change Order 1 (Mrs. Holbert) |
|
|
:
|
|
Enclosure:
|
Exhibit A and Exhibit B Delta Sierra Middle School Paving Replacement Project Final Deductive Change Order 1 |
|
|
File Attachment:
|
|
Summary:
|
A change order is the formal documentation of an authorized change in scope to a construction contract. Approval ratifications is presented for the following project: Delta Sierra Middle School Paving Replacement Final Deductive Approval #1 ($12,369.80). All of the change order items within these Approvals have been authorized in the field by the District, as necessary modifications to complete the project, or to meet District requirements, and are submitted at this time for ratification by the Board of Education. The “A” Exhibits describe the details of the changes for all of the subject projects, while the “B” Exhibit summarizes cumulative contract changes. |
|
|
Funding:
|
This project was funded by SRCO (F40). |
|
|
Recommendation
|
It is recommended that the Board of Education approve ratification of the changes itemized and summarize cumulative contract changes in the Attached Exhibits. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Joe Patty - Director III, Maintenance & Operations |
|
Signed By: |
|
Edith Holbert - Executive Director of Operations |
|
Signed By: |
|
Neil Young - Superintendent |
|
|
|
|
|
|
|